Alvin CTE Phase 2

Manvel, Texas

Additional Info:

  • Location: Manvel, Texas
  • Completed: December 2017
  • Square Feet: 161,000
  • Owner: Alvin Independent School District
  • Architect: PBK Architects

Manvel, Texas, witnessed the rise of a pioneering educational structure in December 2017. The Alvin CTE Phase 2, an expansive project spanning 161,000 square feet, exemplifies the dynamic future of career and technical education (CTE) in the region.

This visionary project comprises two main sites that cater to approximately 800 students, a testament to Alvin ISD’s commitment to offering unparalleled CTE opportunities. This sprawling campus seamlessly marries state-of-the-art new construction with the refurbishment of existing structures, ensuring a blend of modern amenities and cherished history.

Highlight Features:

  • Two Distinct Sites: The project’s uniqueness lies in its bifurcation into two sites. While the first site serves primarily as a detention area, the second site has its roots as a former middle school campus. This dual-site approach ensures optimal use of space and resources.
  • State-of-the-art Two-Story Structure: The heart of the Phase 2 project is the newly constructed two-story building on site two. This structure stands as an emblem of modern educational architecture, designed with every amenity in mind to cater to the diverse needs of CTE students.
  • Refurbished Legacy: Adding a touch of legacy, one of the existing buildings on site two has been retained and given a rejuvenating refurbishment. This ensures that while students get the best of contemporary infrastructure, they remain rooted in the institution’s rich history.
  • Diverse Learning Environment: With facilities tailored for various technical disciplines, the Alvin CTE Phase 2 ensures students have access to a holistic learning environment, preparing them for the challenges of tomorrow.

With the meticulous design insight from PBK Architects, the Alvin CTE Phase 2 stands as a monument to forward-thinking educational infrastructure. It’s a glowing testament to Alvin ISD’s vision of shaping the next generation of technical professionals.

Scroll to Top