Alvin CTE Phase 1

Manvel, Texas

Additional Info:

  • Location: Manvel, Texas
  • Completed: 07/2015
  • Square Feet: 25,000
  • Owner: Alvin Independent School District
  • Architect: PBK Architects

In the bustling city of Manvel, Texas, an ambitious transformation took place that aimed at fortifying the career and technical education (CTE) capabilities of Alvin Independent School District. The Alvin CTE Phase 1 project demonstrates a vivid example of reinventing spaces to serve evolving educational demands.

The erstwhile gymnasium was repurposed and given a fresh lease of life as a state-of-the-art auto shop. With a sprawling area of 25,000 square feet, the facility is armed with advanced tools and equipment ensuring that the students get a hands-on experience that parallels professional auto-repair shops.

Highlight Features:

  • Multiple Auto Lifts: With six dedicated auto lifts, students are ensured of ample practical time, honing their auto-repair and maintenance skills.
  • Truck Lift: Catering to heavier vehicles, the truck lift provides students a broader scope of understanding and working on various types of vehicles.
  • Paint Spray Booth: An essential for any comprehensive auto-shop program, this feature ensures students get well-versed with the art and technique of vehicle painting.
  • Dedicated Classrooms: Apart from the hands-on training areas, the facility also hosts classrooms. These spaces are dedicated to theoretical learning, ensuring students grasp the fundamental principles before diving into practical applications.

Designed meticulously by PBK Architects, the Alvin CTE Phase 1 project stands as a beacon for other institutions to follow. By repurposing existing infrastructure to serve pressing demands, Alvin ISD has showcased how adaptability and vision can come together to craft spaces that shape the professionals of tomorrow.

Scroll to Top